Sign up for PayPal and start accepting credit card payments instantly.

IGI Terminal 3 is ready for 2010 Commonwealth Games and 2011 Indian Grand Prix

July 5, 2010


HISTORY

Founder : G.M. Rao (a mechanical engineer)
Year : 1978

GENERAL INFO AT PRESENT AIRPORT UPGRADING

Airport :
Indira Gandhi International Airport (IGI) Terminal 3
Ranking :
one of the 10 largest in the world, the 5th. 
Completion Costs :
US$2.5bil 
Completion Record Time :
37 months (normally take 60 months)

CORPORATE DATA

Consortium :
India’s infrastructure group GMR, Airport Authority of India (AAI), Germany’s Fraport. and Malaysia Airport Holding Berhad (MAHB) 
Consortiujm Stake Holding :
GMR (54%), AAI (26%), Fraport (10%), and MAHB (10%)
Handling Capacity :
34 million passengers (expandable to cater to 100 million passengers)
Commercial Operations Commence :
July 14, 2010

LEADING FEATURES

Walkway :
92 moving walkways
Connecting Bridge :
78 aerobridges connecting the boarding area directly to the aircraft
Special Design :
Support Airbus A380 planes.
Runway :
3 runways
Checking Counter :
95 immigration counters
Baggage Handling Capacity :
12,800 bags an hour.




No comments:

Post a Comment

Followers

Enter your email address:

Delivered by FeedBurner

Time Management Articles



This video is about Bhopal Leak Gas Issue. I'll not remove this video until the re-opened court case settled with victims' families/relatives got real/true justice. You also can click the 'India Forum - Click Here' button embedded on the video panel to join the forum special for Indians and NRIs. <a href="http://www.linkedtube.com/AT5S49WYAOc3fc28960abe13a17833077915439e4b3.htm">LinkedTube</a>

only emaos client

Bookmark and Share
Add link

India Forum

Special India based forum for all Indians and NRIs
Create gif animations. Guggle