July 5, 2010
HISTORY
Founder : G.M. Rao (a mechanical engineer)
Year : 1978
GENERAL INFO AT PRESENT AIRPORT UPGRADING
Airport :
Indira Gandhi International Airport (IGI) Terminal 3
Indira Gandhi International Airport (IGI) Terminal 3
Ranking :
one of the 10 largest in the world, the 5th.
one of the 10 largest in the world, the 5th.
Completion Costs :
US$2.5bil
US$2.5bil
Completion Record Time :
37 months (normally take 60 months)
37 months (normally take 60 months)
CORPORATE DATA
Consortium :
India’s infrastructure group GMR, Airport Authority of India (AAI), Germany’s Fraport. and Malaysia Airport Holding Berhad (MAHB)
India’s infrastructure group GMR, Airport Authority of India (AAI), Germany’s Fraport. and Malaysia Airport Holding Berhad (MAHB)
Consortiujm Stake Holding :
GMR (54%), AAI (26%), Fraport (10%), and MAHB (10%)
GMR (54%), AAI (26%), Fraport (10%), and MAHB (10%)
Handling Capacity :
34 million passengers (expandable to cater to 100 million passengers)
34 million passengers (expandable to cater to 100 million passengers)
Commercial Operations Commence :
July 14, 2010.
July 14, 2010.
LEADING FEATURES
Walkway :
92 moving walkways
92 moving walkways
Connecting Bridge :
78 aerobridges connecting the boarding area directly to the aircraft
78 aerobridges connecting the boarding area directly to the aircraft
Special Design :
Support Airbus A380 planes.
Support Airbus A380 planes.
Runway :
3 runways
3 runways
Checking Counter :
95 immigration counters
95 immigration counters
Baggage Handling Capacity :
12,800 bags an hour.
12,800 bags an hour.